Porject Management Services

Our Serices

Our Services and Solutions for the Industry

Determination of WPP Project Site and License Application

The selection and planning processes of the project site in accordance with the technical criteria in order to get the most efficiency are carried out under this heading. After the final project site is determined, the EPDK License application process is also managed by us.

Ensuring the Installation and Follow-up of Wind Measurement Stations

  • The most suitable wind measurement points representing the site, measurement heights and meteorological measurement parameters are determined.
  • Wind measurement stations for energy purposes are installed in the designated places and a station installation report is prepared.
  • Wind measurement stations for energy purposes are operated, maintained and repaired,
  • The measured data are collected and made available by performing reliability tests and statistical analyses.

Teknik Fizibilite Raporunun Hazırlanması

  • Map sheets of the field and 3D digital terrain elevation maps are provided.
  • A technical feasibility report of the electricity generation facility is prepared using the measurement data and related maps.
  • A needs analysis is made for wind energy applications to be made outside the license application, and according to the results of this analysis, the facility capacity is determined and its technical feasibility is prepared.

Preparation of WPP License Application File


For a project to be developed in a field, a "License Application File" is prepared according to the "Electricity Market License Regulation". In this context, administrative and technical documents are prepared, necessary calculations are made, and the corner coordinates of the power plant site are determined according to the principles specified in the "Power Plant Site Determination Method", and the power plant site area is drawn and recorded on the maps.

Making Applications for TRES Power Plant Site Change

In case of changes in the power plant sites prepared during the license application in accordance with the relevant legislation, the preparation of the last power plant site and the mapping process.