The selection and planning processes of the project site in accordance with the technical criteria in order to get the most efficiency are carried out under this heading. After the final project site is determined, the EPDK License application process is also managed by us.
For a project to be developed in a field, a "License Application File" is prepared according to the "Electricity Market License Regulation". In this context, administrative and technical documents are prepared, necessary calculations are made, and the corner coordinates of the power plant site are determined according to the principles specified in the "Power Plant Site Determination Method", and the power plant site area is drawn and recorded on the maps.
In case of changes in the power plant sites prepared during the license application in accordance with the relevant legislation, the preparation of the last power plant site and the mapping process.